BAYER

Building F Renovation

The West and East Wing renovations at Monsanto included 168,000 SF of renovation with selective demolition of their existing four-story infrastructures. The new West and East Wing infrastructures each house Information Technology Technical and Administrative Personnel in 450 offices and cubicles on a raised floor distribution system.The renovation of a 70 ft sky-bridge that connects Buildings F and G was also part of the project. The sky-bridge received new exterior windows, standing seam metal roof system, HVAC equipment and interior improvements.

The F Building project has been awarded LEED Silver Certification. The project design included several components worthy of LEED certification points, including the removal and replacement of all 1,000 of the building’s existing windows in Phase II and recycled paper insulation behind the building’s granite skin.